A data centre is not an ordinary object. The infrastructure that comes in, the data stored in it and the processes that run on it represent a value that goes far beyond the stones and the steel. Security is treated too often as a lockpoint: something that is arranged when the building is finished. That is exactly when the greatest damage has already been done.
Dutch Crowd Security joins the first construction phase and stay on when the keys are transferred. Not as a sub-contractor coming on call, but as a lead contractor running the entire line. From access control at the construction site to 24/7 site security after delivery.
Why does data centre security start in the construction phase?
A data centre distinguishes itself from a regular construction project at one point that changes everything: the value of what is being built and installed. Early in the construction process, components will be located that individually are worth tens of thousands of euros. Server infrastructure, cabling, cooling systems, emergency power supplies. All targets.
At the same time, a construction site is naturally an open environment. Dozens of parties are mixed up. Suppliers, subcontractors, inspectors, mechanics. If no one keeps track of who comes in, when and with what assignment, then this lack of control is a major risk.
What are the risks associated with the construction of a data centre?
Buyer stealing has been a problem at construction sites for years, but with data centres hardware is added: equipment that is still in the box and is waiting for the next installation step. One truck, one night, and a delivery of great value is gone.
In addition, there is the risk of unauthorized access. Not by definition by outside criminals, but also by suppliers’ employees who go to parts of the site where they have no business. At a data centre that can have meaning that goes beyond material damage.
A data centre under construction is more vulnerable than a data centre in use. The infrastructure that comes in is business sensitive. Damage caused at this stage is often visible only months later.
In the case of welding and grinding, temporary installations and aggregates, fire risk is a real risk. Dutch Crowd Security provides state-certified fire watch officers who are legally competent to act and are directly contactable to the fire department.
How do you set up security during the first construction phase?
The basis is overview. Who’s at the location, when, and with what authority? This requires perimeter security that works, an access regime that applies from day one and a registration system for personnel and suppliers.
CCTV monitoring is a permanent part of a well-protected building site. Cameras record what happens all the time. The combination with on-site security officers is strong, but the human factor remains guiding.
For welding and grinding operations, a state-certified fire watch officer is required by law. A state-certified fire watch officer has specific powers and responsibilities, is accessible to the fire department and can act independently. Dutch Crowd Security has this capacity.
Security dog patrols can be used at locations with a high risk profile or at night when the construction site is abandoned. A well-educated security officer with a dog has a deterrent effect and is therefore a strong addition to the camera system.
How do you scale security as the construction progresses?
A construction site in month two is a different environment than in month twelve. The value on site is increasing and the number of interested parties is increasing. Security that was sufficient in the initial phase is failing halfway through construction. That calls for a security partner to scale. At Dutch Crowd Security, we work with certified suppliers in a network that has 250 to 500 security devices available, depending on peak moments and phasering.
As the value (and thus the risk) of the data centre increases, we add night rounds, additional camera monitoring and, if necessary, security dog patrols. The direction stays with us. The customer has one contact point.
What changes in the transition to delivery?
The transition from construction site to operational data centre is the most vulnerable moment throughout the entire journey. Shifting responsibilities, testing systems, tightening access procedures. If this is not properly coordinated, holes will arise.
At this stage, the access regime will be converted from building protocol to operational protocol. This means stricter procedures, less freedom of movement for external parties and more intensive monitoring of those entering the site. You can think of biometric access control and permanent surveillance.
What does good data centre security deliver?
Good security during construction prevents theft, sabotage and uncontrolled access. Incidents like this cause delays, additional costs and reputational damage that exceed the investment in security many times. A well-protected construction path keeps the planning intact and protects the equipment and infrastructure that is already on site.
Continuity in security provides overview, clear processes and a closing registration. This plays an important role in audits and internal controls, especially in data centres where requirements are high. By working with one batch from the construction phase, that line remains consistent and demonstrable.
Secure data centre? That’s how Dutch Crowd Security does it.
Dutch Crowd Security acts as the main contractor for the full security of your data centre project. From the first construction phase, with access control, fire watch and security dog patrols, to the post-op site security, with 24/7 surveillance, permanent access control and a direct line to the board if anything is going on.
One batch from beginning to end means built-up location knowledge. It means security officers who know how the entrances are put together, which suppliers come in, where the sensitive points are. It means that in the event of an incident, you don’t have to explain the context.
You have one point of contact, regardless of the phase, size or complexity of the project.